This video contains the.
Roof felt installation not flat.
Let it stand for about 30 minutes and then using galvanized nails and your hammer nail down the first layer.
Because your roof deck might not lie perfectly straight or flat a layer of roof paper gives an even uniform surface upon which you can install your shingles.
Setting the roll and then nailing off.
Here alternating layers of roofing felt usually fiberglass and hot applied asphalt are combined to create a long lasting roof system.
Lumpy bumpy or curling shingles that do not lie flat can be problematic but don t hire a new roofer yet.
Installing roof felt is a two person job.
Roll the felt so that it overhangs the edge by 2 inches.
In terms of spacing leave about 6 inches between nails along both of the short sides and the side lying next to the edge of the roof.
It improves look and uniformity.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
A built up roof bur sometimes called a tar and gravel roof is a tried and true style of flat roof.
Installing the roofing felt does take care but can go very quickly.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
Roofing felt prevents the deck from being exposed to the elements before or while the shingles are being applied.
This video walks through the very basic steps for installing tarpaper felt.
Fasten drip edge on eaves with.
The extent of the problem depends upon many factors including the age of the roof the.