Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
Roof framing checklist.
R109 4 r703 1 there is no significant moisture remaining in the wood framing.
Determine if continuous headers are toe nailed to studs with 4 8d nails.
Job address is posted in a visible location per irc section r319 1.
30 ways to pass your framing inspections failing your framing inspection can be expensive especially if you have to stop work to fix mistakes and then go backward and.
Truss roof framing as per design.
Framing a roof is the last step in framing new construction.
Roof framing inspection checklist 1.
Locate the grade mark on the rafter to determine species and grade.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points.
See code section r302 11 for specific locations and approved materials.
Regulation 74 supervisor s checklist handling installation inspection of roof framing general information page 1 of 3 1.
Try this framing inspection checklist template from jotform.
Determine if double studs are face nailed with 10d nails at 24 in.
For all new construction.
While most home builders will outsource the construction of roofing trusses the rafter supports of the roof itself learning to frame a roof yourself is one of the true arts of carpentry and a basic primer is covered below.
This template is a free practical and useful tool in creating an audit report for your construction company.
Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a.
Be a building work supervisor registered with consumer and business services.
Approved documents which show.
Building is safe and accessible.
A person who completes the checklist must.
Are sealed and installed where required.
The penetrations at top and bottom plates fire blocks soffits ceiling lines etc.
Determine if studs are toe nailed to sole plates with at least 3 8d or 2 16d nails.
In accordance with regulation 74 at least one 1 business day s notice must be given to the council of the intended completion of all roof framing forming part of the building work.
The roof is complete and exterior moisture barriers are installed.