Work up from the initial row starting at the lower corner in a diagonal pattern staggering the shingles to prevent gaps.
Roof shingle installation manual.
3 bundles 1 bundle of 20 and 2 bundles of 22 when applied according to instructions will cover 98 4 square feet 9 14 square meters.
Butt a full shingle up against the cut shingle and nail into place.
Using your staple gun secure the felt to the roof.
Use minimum 3 8 10 mm plywood or osb decking as recommended by apa the.
Overlap each row at least 3 to 4 inches.
Gaf shingles must be installed on slopes of 2 12 or greater.
Panel installation should begin at the gable end of the roof opposite the prevailing rain bearing wind this will provide added assurance against wind driven rain being forced under the laps.
Most metal shingles will be attached to the roof using metal shingle.
Legend installation instructions 36 spanish 426 96kb pdf legend 36 quick start guide 857 73kb pdf pinnacle pristine installation hp42 544 35kb pdf.
Use six nails and four spots of asphalt roofing cement for every full shingle for every full shingle as shown below.
Place the leading edge of the first panel along this line.
Roofer s guide to roof installation.
Start by laying asphalt felt or other underlayment over the roof.
Use 4 nails per shingle and 6 nails on the prevailing windward sides of the roof as wind resistance nailing.
Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails.
Installation instructions instrucciones de instalación general instructions coverage.
Measure one panel width in from the roof edge.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Install new flashing metal.
At this point chalk a line from ridge to eave.
The purpose of this guide is to provide you with quality instructions and detailed procedures on roof application and product installations following the asphalt roofi ng.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
If you live in an area with inclement weather you should consider using a special ice and water protector.